Tank, vessel and pipe coatings/paint are often expensive and require specialist equipment and skills to apply. The companies have the experiences and tools to apply a number of different coating systems such as Belzona, Glass Flake and Lining Systems.

Available Equipment

NOEQUIPMENTQUANTITY
1Compressor2 units
2Blasting Pot11 units
3Conventional Spray Pump20 units
4Airless Spray Pump2 units
5Spray Gun12 units
6Thermal Spray Machine4 units
7Air Receiver Tank (500 Liter)3 units
8Air Receiver Tank (1000 Liter)1 units
9Air Receiver Tank (150 Liter)2 untis
10Manifold4 Units
11Hose Blasting 1 1/4" (40 Meter)7 Rolls
12Hose Blasting 1 1/4" (20 Meter)3 Rolls
13Hose Blasting 3/4" (24 Meter)3 Rolls
14Hose Blasting 1/2" (20 Meter)2 Rolls
15Hose Toyok (20 Meter)10 Rolls
16Mixer2 units
17Hand Grinding Pneumatic18 units
18PFP Plural Pump2 units
19Air Dryer2 units
20Blower Fan6 units
21Adhesion Tester2 units
22Coating Thickness Gauge3 units
23Sling Hygrometer2 units
24Dew Point Calculator2 units
25Surface Thermometer2 units
26Wet Film Combs2 units

Track Record.

PROJECTMATERIALAREAYEAR
Mersk Dan Fg Pipe Work - (Carbon & Stainless SteeL)Belzona Steel750 M22004
KNM Engineering Pressure VesselsBelzona Steel150 M22005
Hyflux Desalination TanksThortex1750 M22005
Prosafe De Ivoire (Offshore Pipe Lining)Belzona Steel50 M22006
PTT Bongkot Hook Up & Tie In’s Live Platform Up grade
Offshore
Painting4000 M22005
PTT Bongkot Internal Pipe Spin Blasting & Centrifugal Paint Lining 4” to 24” DiametersInternal Coating1050 M22006
Kediri Bridge Infrastructure-Railway StationSigmaZinc 1021513 M22007
LPG Tank - Oil & Gas tank Storage OthersSigmaZinc 1021200 M22007
Lining EPP Project Containment Coating (Lining)Lining125 M22008
Jetty Facilities Oil & Gas - JettiesSigmaprime 2001825 M22008
New Building Tank PDAMWaste &WaterSigmaprime 2001990 M22008
Row Line Pipeline 4 IncSigmaZinc 1581530 M22009